So, I forgot to mention before. They installed two new cabinets in the colony. One at the very end of phase 3 (start of phase 4) and one in Phase 1 or 2 (somewhere there).
It looks something like this
It got installed on like the 5th. Since then they've closed up some of the holes they dug up and opened some new ones.
I'm getting restless @_@ It's been a whole month since they've started and all these holes they've dug up have dirt that gets on my shoes.
My room is a mess with all the dirt I track in. Even in other places I've seen dirty footprints of mud on the floor. They should've taken a week tops to quickly dug up and finish the installation process.
Should've focused on one area and dealt with that quickly before moving on to the next. They're trying to do multiple places at once.